Case study
Cutting energy Costs
Reducing energy costs & improving efficiency at a restaurant chain in Lagos

Background
A national restaurant chain in Nigeria operates multiple high-demand sites in regions across Lagos. Frequent outages and oversized diesel generators led to high energy costs, inefficient operations, and difficulty in justifying renewable investments without clear performance data.
Objective
To reduce energy costs, improve operational efficiency, and gather the data needed to support renewable energy adoption while maintaining reliable power across all sites.
Methodology
enee.io deployed plug-and-play IoT sensors across the chain's energy assets, including generators and grid inputs. The system provided:
-
Live data tracking via web and mobile dashboards
-
Detailed energy profiles for each site
-
Automated alerts for proactive maintenance
-
Comparative analysis to identify underperforming locations
Findings
The analysis showed:
-
165kVA generator operating at <25% capacity, wasting fuel
-
Significant phase imbalance between electrical loads
-
Opportunity to replace existing generator with smaller, more efficient unit
-
Solar PV could meet 25% of site demand, cutting annual costs by ₦18M
Action Taken
​
-
Replaced 165kVA generator with an 80kVA unit for optimal load efficiency
-
Corrected electrical phase imbalance to reduce component wear
-
Used enee.io data to secure the case for 30kWp solar PV installation
​
Results
-
₦10 million annual savings from generator right-sizing
-
₦18 million projected annual savings from solar PV
-
ROI on enee.io monitoring system <1 month
-
Solar project ROI 23–26 months with finance options to avoid upfront costs
-
Reduced diesel generator runtime, fuel consumption, and maintenance needs
Explore the insights

NEPA Grid
Power summary
Average 27.25 kW Peak 58.56 kW
​
165KVA genset
Power summary
Average 16.91 kW Peak 49.17 kW

NEPA Grid
Uptime summary
Daily av. 13h31m Total 205h43m
​
165KVA genset
Runtime summary
Daily av. 3h9m Total 47h16m
​
Maximum monitored time during trial is 16hours per day: device had no power overnight

NEPA Grid
Energy summary
Daily av. 434 kWh Total 6369 kWh
​
165KVA genset
Energy summary
Daily av. 50 kWh Total 722 kWh